Результатов: 13

Swiss company to conduct feasibility study for construction of hydropower plant in GBAO’s Shugnan district

Gruner Stucky Ltd, a Swiss consulting firm, will develop the feasibility study for the construction of the Chartеm hydroelectric power station (HPP), which is planned to be built on the Ghund River near the village of the same name in Shugnan district of the Gorno-Badakhshan Autonomous Region (GBAO), says the press center of the Ministry Energy and Water Resources of Tajikistan (MoEWR). asiaplustj.info »

2024-10-4 09:10

Dushanbe does not conduct negotiation with representatives of the Taliban Movement

In a report released at a news conference in Dushanbe, Tajik Foreign Minister Sirojiddin Muhriddin noted on July 27 that Dushanbe has always considered “official Kabul as a legitimate government in Afghanistan ad has never conducted meetings or negotiations with representatives of the Taliban Movement. asiaplustj.info »

2021-7-28 13:56