2021-4-3 15:06 |
A power transmission line of the of the 1000 Electricity Transmission and Trade Project for Central Asia and South Asia (CASA 1000) Project that provides for supplying electricity from Kyrgyzstan and Tajikistan to Afghanistan and Pakistan can be introduced into operation only by 2025, the head of the Open Joint-Stock Company (OJSC) Kyrgyzstan National Power Grid Ulan Abdyrasulov told Kabar
Подробнее читайте на asiaplustj.info ...