Результатов: 2

Kairakkum hydroelectric power station began to stock up on water to generate electricity in winter

Power engineers of Tajikistan started collecting water resources in the Kairakkum reservoir to generate electricity in winter only last week. This is explained by the fact that in the past dry summer, the republic sent almost all the water of the Syrdarya river to the irrigation needs of Kazakhstan and Uzbekistan, as well as local farmers. asiaplustj.info »

2021-9-22 14:40